Receipt/unloading

 

Before an LNG carrier starts to unload, a detailed safety checklist is run through. The liquefied gas is pumped from the ship through an unloading installation and a short pipeline to storage tanks on land. A closed vapour return system ensures that there is no under-pressure or overpressure in the tanks. Unloading is efficient and safe.